i12go2wdw
DIS Veteran
- Joined
- Jul 3, 2001
We are going Aug.23 to Sept 6, 14 wonderful days. Today was my 180 days out mark so I was able to book up to Sept. 1 (180 +10) can I book for Sept.
2nd tomorrow and 3rd the next day or do I need to wait for 180 days from Sept. 2nd. I know I had the same problem last year trying to do it and ended up having to talk to a supervisor which left me feeling like I was trying to get away with something,but I was able to do it. Does anyone know the policy on this?
Thanks
2nd tomorrow and 3rd the next day or do I need to wait for 180 days from Sept. 2nd. I know I had the same problem last year trying to do it and ended up having to talk to a supervisor which left me feeling like I was trying to get away with something,but I was able to do it. Does anyone know the policy on this?
Thanks