The last piece of the track was installed this morning.
There is still work to be done on the station and the maintenance building, and the area over the water by the flamingo boats still has to be put into its final condition. But other than that (and whatever landscaping they do) it looks like ride testing should start to happen sooner rather than later.
The rest of the realm is moving along, with some pieces of what looks like a ship wreck close to the Clyde and Seamore area.
There is still work to be done on the station and the maintenance building, and the area over the water by the flamingo boats still has to be put into its final condition. But other than that (and whatever landscaping they do) it looks like ride testing should start to happen sooner rather than later.
The rest of the realm is moving along, with some pieces of what looks like a ship wreck close to the Clyde and Seamore area.