The video shows a digital rendering of what it's going to look like. It looks like there's going to be a lot more middle pieces once it's done.I thought the trains would have more seats by looking at the concept art they would seat 18 per train. The train they are showing only seats 6 in the current videos. Hopefully this is only a test train and they have more cars to add onto slinky.
Disney Parks Blog Video Link:
https://instagram.com/p/BYbCrmnBkst/
I thought the trains would have more seats by looking at the concept art they would seat 18 per train
The rendering released by Disney actually showed 10 rows per train, not 18.
Looking at the track layout, I am guessing there will be 4 trains on the track.
From construction shots it looks like there will be separate load and unload spots like 7DMT. So:I think it depends if it loads like 7DMT or BTM. If only one side loading my guess would be 3 trains.
From construction shots it looks like there will be separate load and unload spots like 7DMT. So:
1st train in load.
2nd train in unload.
3rd train waiting at first launch point and launched when the 4th train in 2nd half of course reaches brake run.
4th train gets 2nd launch point through brake run before station
I was going off the photo below. I only counted 18 ppl on the ride but missed that there is also a back seat that looks empty, also possibly an empty front seat. So it should hold at least 20 ppl per train.
View attachment 265747