Helvetica
DIS Veteran
- Joined
- Apr 24, 2018
So just checked wait times out of curiosity and you have
Toy Story Land:
- SDD: 75 mins
- AS2: 45 mins
- TSM: 60min
really not bad for a new land, a holiday week
Meanwhile, in Pandora:
- FoP: 115 min
- NRJ: 70min
still, not bad at all for July 4th but FoP definitely retaining the wait times - surprised NRJ is as long as it is
For comparison, so other wait times:
- Frozen Ever After: 45min
- Test Track: 60mins
- Soarin: 40mins
- Space Mtn: 105mins
- Buzz: 70mins
- BTMRR: 80 mins
- Splash Mtn: 95 mins
- RnRC: 90mins
- ToT: 95mins (interesting these two have a longer wait than SDD)
I don't know what the actual capacity for SDD actually is, but it's really surprising to me how quickly they get that thing loaded and unloaded. In one of the DisUnleashed videos they were trying to talk in front of SDD and it seemed like every 30-45 seconds a new car was going by them. For a rollercoaster, the efficiency on that thing is pretty amazing.