That is today's $64,000 question.This photos is before the major refurbishment. So have they not remodeled buildings 30-33?
That is today's $64,000 question.This photos is before the major refurbishment. So have they not remodeled buildings 30-33?
Very drab looking kitchen (from the photo on tripadvisor). No more pretty tile backsplash although getting rid of the tile countertops was a good move. Bland colors.There is 1 pic of an updated kitchen if you go to tripadvisor.
It's glass or polymere, The SSR manager told someone at the member's meeting that they are doing away with grout so it sounds like they are putting it in at SSR also. Just like Bay Lake. Easy to clean I suppose. That's a legit photo (the one on the review saying they've stopped in the refurb room) I'd say- they'd have to be a genius with Photoshop, changing the TV cabinet, the appliances etc. Amazing it took them so long to decide on such a minor renovation isn't it?The only photo I could find on Trip Advisor that look different than the current room, looked photo shopped. There wasn't any tile behind the kitchen sink. It just did not look right. I don't think that is a legit photo.
They aren't supposed to be completed until mid-2019.I just came to ask if the OKW renovations were complete. I'm thinking about a stay in May/June. I'll take this a, "not yet."
The bathroom re-do is the bit that will take a while. Tile demolition and replacement is not rapid like softwoods or just pulling appliances and replacing.They aren't supposed to be completed until mid-2019.
I'm not convinced. The OKW rehab was delayed 10 months due to how extensive it would be (big design changes after feedback) and the kitchen cabinets are exactly the same as the ones appearing on the first DVC promo video which is on YouTube. 26 years and counting....OT
When we checked in at SSR on Wed had a nice conversation with one of the managers. He was doing a sell on the 2019 renovations being quite extensive. I, for one, hope they make the shower door entryways wider.
I still can't believe we've not had any detailed pics yet. I'm particularly interested in the studios. Still two beds? Better lighting in the kitchenette area? Soundproofing of the connecting door?
We await with baited breath.Just got the room assignment in building 33! Will report with pictures